Selection guide
Open the stud length calculator
- After welding, the stud must project at least 38 mm (1.5 in) above the top of the metal deck: length after weld >= deck rib height + 38 mm.
- Each stud diameter needs its matching ceramic ferrule; through-deck welding uses the through-deck ferrule type.